Kidston pumped hydro to have more storage

In an ASX announcement Genex Power reported on its Technical Feasibility Optimisation which upgrades the storage from 6 to 8 hours operation at 250 MW.  This is an additional 33% over the earlier indications that it would provide 6 hours operation at 250 MW. Other conclusions from the optimisation are that variable speed pump-turbines will … Continue reading Kidston pumped hydro to have more storage